Calls grow to overhaul ‘inadequate’ Ivybridge rail services and ease A38 congestion

(L-R) Councillor Victor Abbott, Tim Steer of Railfuture and John Pope, chair of the Ivybridge Rail Users Group (IRUG) at Ivybridge Stationplaceholder image
(L-R) Councillor Victor Abbott, Tim Steer of Railfuture and John Pope, chair of the Ivybridge Rail Users Group (IRUG) at Ivybridge Station | © Jamie Townsend

With eleven westbound trains passing through on weekday afternoons and only one stopping, campaigners and councillors are urging Network Rail to unlock a simple platform fix

Rail campaigners and councillors are calling for urgent upgrades at Ivybridge railway station as a long-awaited feasibility study into extending its platforms nears completion.

John Pope, chair of the Ivybridge Rail Users Group (IRUG), local councillor Victor Abbott, and Tim Steer of Railfuture met Moorlander reporter Jamie Townsend at the station on Saturday (November 21), where more than 25 passengers were waiting on the platform for a morning service towards Exeter.

Despite being, with the exception of Newton Abbot, the largest town on the main line between Plymouth and Exeter, Ivybridge is bypassed by the majority of trains.

While just over half of Great Western Railway (GWR) services call at the station, these are almost exclusively local stopping trains, with nearly all CrossCountry and high-speed GWR services to London Paddington passing straight through.

According to timetable figures supplied by IRUG, between 11:05am and 4:06pm on weekdays, only one westbound train stops out of 11 passing through, while between 10:52am and 4:50pm, just two eastbound trains stop out of 14.

A high-speed GWR train passing through Ivybridgeplaceholder image
A high-speed GWR train passing through Ivybridge | © Jamie Townsend

The main barrier is platform length. Ivybridge’s flat platform surfaces measure 104 metres, while five-carriage CrossCountry trains are 120 metres long and lack selective door opening, meaning they cannot safely call at the station.

In January 2025, following an enquiry made on the group's behalf by South West Devon MP Rebecca Smith, CrossCountry confirmed that extending the platforms was the best way forward.

Mr Pope proposed raising the sloped access ramps at both ends of the platforms, which would bring the usable lengths to 124 metres on one side and 129 metres on the other.

"Simply by levelling up the ramps at each end of the platform, we would have enough space for them to stop,” Mr Pope said.

"Ivybridge is an unusual town because most of its residents don't work in Ivybridge, they commute out in one direction or another, a lot towards Plymouth, some towards Exeter.

The ramps at each end of the platform could be levelled out for trains to stopplaceholder image
The ramps at each end of the platform could be levelled out for trains to stop | © Jamie Townsend

“The regular services are the CrossCountry and GWR high-speed services. Until we have regular services, we cannot get bus services to co-ordinate with them."

Following site meetings in early 2025, Network Rail quoted £20,000 for a formal feasibility study.

South Hams District Council agreed to fund the work and signed the contract directly with Network Rail on March 24, 2026.

The study was delayed after GWR asked Network Rail to also assess whether trains could turn around at Ivybridge during upcoming re-signalling closures between Ivybridge and Plymouth.

That option would require track crossover points and either a full platform extension or a walkway allowing drivers to walk the length of a nine-carriage train.

Ivybridge Station has seen a rapid increase in its passenger traffic in recent yearsplaceholder image
Ivybridge Station has seen a rapid increase in its passenger traffic in recent years | © Jamie Townsend

IRUG has now seen an uncosted draft of the report, which examines three options covering the ramp levelling and turn-around infrastructure, with the fully costed report expected to go to South Hams District Council this week.

Installing crossover points at Ivybridge would also unlock wider regional rail ambitions, including a proposed Plymouth Metro network linking Gunnislake, Plymouth, and Ivybridge, as well as future plans to reinstate rail services to Tavistock.

Tim Steer, chair of the Devon and Cornwall branch of Railfuture, said Ivybridge should be an immediate priority.

"At the moment we're seeing trains going past and they're not stopping here. So we'd like to see, with the new Plymouth Metro that's emerging, Ivybridge as one of the first things that is put through,” Mr Steer said.

"With the re-signalling programme that they want from Bere Alston to Plymouth, we could then see the service at Ivybridge improved, and then, of course, that would be the first phase of getting the extension to [Tavistock], because it will allow enough services to be on the line to support going to Tavistock."

Ivybridge Station has also seen a rapid increase in its passenger traffic in recent years.

Official station usage figures supplied by Railfuture to The Moorlander show a leap of more than 50 per cent since the pandemic, rising from 100,900 in 2022/23 to 155,352 in 2025/26.

Cllr Victor Abbott, who represents Ivybridge across Devon County Council, South Hams District Council, and Ivybridge Town Council, highlighted the station’s accessibility within the town.

Built in 1994 roughly half a mile from Ivybridge's original viaduct station, the current stop sits within easy walking distance of the town's growing residential areas and serves surrounding rural communities such as South Brent.

With Plymouth ranked as one of the most congested cities in the South West and severe parking pressures around the Devonport Dockyard, campaigners say improving rail links at Ivybridge is also critical to taking commuters off the A38.

Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice